Power shut down on USHP-I Sumbal on Sept 12 to 14
SRINAGAR; 10, Sep 2012: According to the Power Controller, Power Development Department, Kashmir), the power supply to the areas fed from Upper Sindh Hydel Project (USHP)-I, Sumbal shall be affected on September 12 to 14, 2012 on continuous basis.
No comments: