Power Shut-down of 33kv Thatri-Gandoh Line
DODA, Dec 26: In order to carry out the stringing work on the 132 KV transmission line by TLMD Udhampur, the Sub- Transmission Division Doda has desired to avail the shut down on 33 KV Thathri-Gandoh line. . . .
Keeping in view the essential work to be carried out on the 132 KV line, the power supply shall remain affected on 27-12-2011 and 29-12-2011 from 9.00 a.m to 5.00 p.m.
No comments: